Search

Installation Fee

Items Standard Installation Price (HKD) Stairs fee/floor (HKD)
Built-in Gas Stove Comply with safety standard 2 ft. steel mesh hose, gate switch and voltage regulator 800 100
Built-in LPG Stove Comply with safety standard 2 ft. steel mesh hose and gate switch 800 100
Additional charges with special installation
Change the countertop (artificial stone) 500
Change the countertop (marble) 700
Electric Hob / Induction Hob Connect to the power supply (the distance should not exceed 2 ft. of the potential of the stove) 700 100
Oven / Electric Steam Oven Connect to the power supply (the distance should not exceed 2 ft. of the potential of the stove) 700 150
Additional charges with special installation
Seal the gas level 300
Electric wire(10 ft. with 20A light switch ) 500
Electric wire(more than 6 m) 100
Add a socket(surface mounted) 300
Add light switch position(surface mounted) $500(13A)
$500(15A)
$600(20A)
$700(30A)
Under Cabinet Cookerhood 8 ft. long 5″/6″ diameter paper throat(not include the length of the chimney)﹑ Cut out hole at bottom of cabinet 700 100
Telescopic Type Hood 8 ft. long 5″/6″ diameter paper throat(not include the length of the chimney)﹑ Cut out hole at bottom of cabinet 800 100
Chimney Type Hood 8 ft. long 5″/6″ diameter paper throat(not include the length of the chimney)﹑ Cut out hole at bottom of cabinet 900 150
Island Type Hood 8 ft. long 5″/6″ diameter paper throat(not include the length of the chimney)﹑ Cut out hole at bottom of cabinet 1,500 150
Additional charges with special installation
Aluminum angle installation
Add wooden holes 100
Aluminum ceiling hole 200
Lengthened foil throat 300
Extended fire hose 400
Assembling and disassembling kitchen cabinet panels and changing cabinets 600
Change a pair of the kitchen cabinet door 300
Change the length of the chimney by one pass 400
Built-in Microwave Oven Install the microwave oven and frame 700 100
Built-in Steam Oven Connect to the power supply (the distance should not exceed 2 ft. of the potential of the stove) 700 100
Additional charges with special installation
Electric wire(10 ft. with 20A light switch) 500
Electric wire(more than 6 m) 100
Add a socket(surface mounted) 400
Add light switch position(surface mounted) 400(13A)
500(15A)
600(20A)
700(30A)
Built-in Dishwasher Install the door blade, connect the water level and power supply (Customers need to bring their own door blade(if required), water level and power supply, and the distance should not exceed 2 ft. from the back of the machine) 700 150
Built-in Washer Connect the water level and power supply (Customers need to bring their own door blade, water level and power supply, and the distance should not exceed 2 ft. from the back of the machine) 700 150
Built-in Refrigerator(Small) <900mm(H) Install the door blade, connect the power supply (Customers need to bring their own door blade and power supply, the distance should not exceed 3 ft. from the back of the machine) 800 150
Built-in Refrigerator(Big) <1800mm(H) Install the door blade, connect the power supply (Customers need to bring their own door blade and power supply, the distance should not exceed 3 ft. from the back of the machine) 1,000 150
Adjust the door hinge before shipment 200
Ceiling Mounted Type Dehumidifier Standard installation includes: Connect the wires, hang the screw rod, connect to the drainage, all subject to the surface installation(Additional engineering costs will be confirmed by the master after viewing his position) 1,000 150
Window Type Standard installation includes:Connect the wires, hanging up, all subject to the exposed installation(Additional engineering costs will be confirmed by master after viewing his position) 800 100
Food Waste Disposer Standard installation includes: Connect the wires, replace U hose 1,000
Sink 35mm hole(Warehouse) 300
35mm hole(On-site hole opening) 800
No more than 18mm hole(Warehouse) 400
No more than 18mm hole(On-site hole opening) 900
Island Extra Fee(Discovery Bay) Shipment/Site inspection/Installation Additional surcharge 300
Tung Chung/Ma Wan Extra Fee Shipment/Site inspection/Installation Additional surcharge 300
Site Inspection Service Hong Kong Island, Kowloon, New Territories 200
Surcharge for removal and disposal of machines Remove and dispose the machines 400
Built under Additional built under surcharge 500
Built under Built under before shipment 200
Back to Top
Product has been added to your cart